Bottom line: Lock specifications before requesting pricing. Complete project information helps the team prepare an initial response normally within 24 hours. Ideal for: Contractors and architects.
1. Project Context
- Destination: Country, city, seaport.
- Project: Villa, hotel, residential tower, fit-out.
- Constraints: 20GP/40HQ access, unloading equipment.
- Milestones: Factory dispatch, site installation dates.
2. Drawings & BOQ
- Plans: Vector CAD with finished floor levels.
- BOQ: Itemized count and opening dimensions.
- Take-Off: Exact m² plus 5–10% waste.
- Schedules: Appliance cut-outs, plumbing rough-ins.
3. Specifications
Use these as example fields to confirm for the selected product and destination market, not as default specifications for every order.
- Cabinetry: E1 plywood, Blum/DTC hardware, 20mm quartz.
- Windows: 6063-T6 aluminum, double/triple Low-E glass, thermal-break.
- Tiles: Full-body porcelain, <0.5% water absorption.
- Sanitary: Solid brass bodies, ceramic cartridges (500,000 cycles).
4. Trade Terms
- Incoterms: EXW, FOB, CIF, or Door-to-Door.
- Milestones: Deposit, mid-production, pre-shipment.
- Warranty: Confirm the category-dependent warranty in the quotation or contract.
5. Quality Control
- Shop Drawings: Approve CAD dimensions.
- Samples: Sign-off on physical color chips/swatches.
- Inspection: Confirm pre-shipment inspection and photo/video reporting where applicable.
6. Packing
- Labels: Room-tagged crates (e.g., Master Bedroom Vanity).
- Crates: Fumigated wood with foam corners.
- Loading: Heavy cargo bottom, light cargo top.
Next Step
Share a link to your plans for an initial project response normally within 24 hours when sufficient information is provided by our Foshan team. Request a Project Quote →