FOSHAN SOURCING & SUPPLY

Hardware & Building Components

Architectural hardware bundled directly with primary material orders.

Best for: Developers, architects, and high-end residential contractors.

Hardware & Building Components

ENGINEERING CAPABILITY

Backed by 100+ structural and interior designers.

Share links to room schedules or a BOQ. We lock dimensions and finish codes early to prevent specification errors.

Share Drawing Link

TARGET APPLICATIONS

Common Fit

  • Best for: General contractors
  • Best for: Millwork installers
  • Best for: Door and window crews
  • Best for: Building material importers

SUPPLY SCOPE

Coordination

  • 304/316 stainless handles, locks, hinges
  • Heavy-duty drawer slides
  • Concealed sliding door tracks
  • Installation fasteners and anchors
  • Spare parts sorting by room

PROJECT SPECIFICATIONS

Procurement Data

Confirm the selected product, destination requirements and supporting documents before ordering.

CustomizationDimensions, materials, drawings and finishes are confirmed for the selected product and approved project scope.
Supply modelIntegrated supply coordinated by George Group; the direct or partner route is confirmed for selected products in the quotation.
Standards & documentsConfirm alloy, corrosion resistance and load requirements for selected hardware; request applicable material or test documents.
MOQVaries by product, customization, quantity and supplier; confirmed with the project scope.
SamplesWhere relevant, approve samples, finish references or drawings before production.
QC & WarrantyPre-shipment inspection and category-dependent warranty support, confirmed for the project.
TurnaroundInitial project response normally within 24 hours after sufficient information is received.
IncotermsConfirm available EXW, FOB or CIF terms for the selected products and destination.

INQUIRY PREP

Checklist before production.

Missing specs cause job-site delays. Clear this checklist to support a complete project quotation.

  • Parent product compatibility
  • Material alloy (SUS304, SUS316)
  • Load capacity
  • Locking mechanism
  • Corrosion resistance
  • Spare parts ratio
Project Quotation & Sourcing

Share links to drawings, a BOQ, or material schedule.

Our Foshan engineering and procurement team reviews your scope and normally responds within 24 hours when sufficient project information is provided.